Quoted vs negotiated target vs actual, by trade and category. Edits save automatically in this browser. Use Save backup to move them to another device.
Connecting…
By category
QuotedTargetActual
By trade
Line items
Reset all numbers to the original quote?
In
Section
Category
Item / scope
Quoted
Target
Difference
Actual
Paid
Status
Notes
Delete
Projected uses Actual where entered, otherwise Target, otherwise Quoted. Leave Target blank to mark a line “Not doing”: it drops out of every total. Difference is Target minus Quoted. Type an amount there to set the target directly: 350 or −350 takes $350 off his quote, +350 goes above it.Adjusting: untick In to drop a line from the totals and see what it saves. Use − / + beside Target to move a price by the ± step.Contingency is reserved on top of the projected cost. Typical for a GTHA reno of an older home: 10–15%, 15–20% if walls are being opened.